Reference Documents

  • Contingency
    • General Resources
      • ANS Response Plan
      • Anomaly Categories
      • Camera Anomaly Reaction Plan
      • Camera Anomalies
      • Table Error Reaction Plan
      • Emergency Contact List
    • AIA
      • AIA troubleshooting guide
      • How to Reconfigure AIA
      • Camera anomaly recovery procedure
      • Table error recovery procedure
    • HMI
      • HMI troubleshooting guide
      • How to Restart HMI
      • Camera anomaly recovery procedure
      • Table error recovery procedure

  • JSOC-IOC
    • Ground Systems
      • JSOC Operations Overview
      • Workstation Configuration Tracking List
      • Useful CVS Commands
      • Secrets of the Clock Plots
      • How to →
        • How to update the ANS list
        • How to restart the ANS
        • How to access the ASIST Page Remote Desktop
        • How to Reboot AIA and HMI Workstations
        • How to Update EGSE Limits
        • How to Update the Event Clock
        • How to Use ITPS
        • How to generate and post the GT/PZT Cal file
        • How to restart the web server
    • Instrument Operations
      • Operator Manual
      • General →
        • INC and RTS Response Tracker
        • H&S Monitoring (includes TSM, INC, and RTS info)
        • Commanding Tutorial
        • How to Configure the Test Bed
        • How to Load Scripts
        • How to switch instrument configuration on SDOIOC-SPR
        • How to create an MPT file
      • AIA →
        • Flight Operations Manual
        • STOL List
        • Script List
        • Current On-Board Directory Listing
      • HMI →
        • STOL List
        • Script List
        • Current On-Board Directory Listing

  • General Reference
    • SDO
      • SDO Operations Agreement
      • MOC-SOC ICD
      • SDO Anomaly Reporting Database
      • On Orbit Anomaly Reports (SDO IAR)
      • SDO Management Information System
      • SDO Personnel Schedule
      • SDO Health & Safety Site
      • SDO Contact List
    • AIA
      • Weekly Reports
      • AIA Operational Constraints
      • Temperature Sensor List & Diagrams
      • Limits →
        • EGSE Nominal Operations Limits
        • EGSE Eclipse Season Limits
        • RDL Limits
    • HMI
      • Weekly Reports
      • HMI Operational Constraints
      • Temperature Sensor List & Diagrams
      • Limits →
        • EGSE Thermal Limits
        • EGSE Non-Thermal Limits
        • RDL Limits